EDISION

Earned Value Project Management (Fourth Edition) - Hardcover - GOOD

Description: Earned Value Project Management (Fourth Edition) - Hardcover - GOOD Product Id:1935589083 Condition:USED_GOOD Notes:Item in good condition. Textbooks may not include supplemental items i.e. CDs, access codes etc...

Price: 6.78 USD

Location: Montgomery, Illinois

End Time: 2024-08-18T07:06:53.000Z

Shipping Cost: 0 USD

Product Images

Earned Value Project Management (Fourth Edition) - Hardcover - GOOD

Item Specifics

Restocking Fee: No

Return shipping will be paid by: Seller

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money Back

Return policy details:

Brand: Unbranded

MPN: Does not apply

Item Length: 10in.

Item Height: 0.8in.

Item Width: 7in.

Author: Quentin Fleming, Project Management Institute, Joel M. Koppelman

Publication Name: Earned Value Project Management-Fourth Edition

Format: Trade Paperback

Language: English

Publisher: Pro-Ject Management Institute

Publication Year: 2010

Type: Textbook

Item Weight: 24.4 Oz

Number of Pages: 231 Pages

Recommended

Chrome Mini Football Helmet Visors With Clips
Chrome Mini Football Helmet Visors With Clips

$3.00

View Details
Anime Space Fighters Type-C RESCULPT! (Set of 6) Wargame Miniatures
Anime Space Fighters Type-C RESCULPT! (Set of 6) Wargame Miniatures

$10.00

View Details
Minnesota Vikings Embroidered 3 3/4" Iron On Patch
Minnesota Vikings Embroidered 3 3/4" Iron On Patch

$3.30

View Details
Kansas City Chiefs Embroidered 3 3/8" Iron On Patch
Kansas City Chiefs Embroidered 3 3/8" Iron On Patch

$3.40

View Details
14mm Aluminum BLACK bowl slide Built In Screen water pipe bong Unbreakable
14mm Aluminum BLACK bowl slide Built In Screen water pipe bong Unbreakable

$9.99

View Details
For Nissan Maxima Altima Front Grille Emblem 2019, 2020, 2021, 2022
For Nissan Maxima Altima Front Grille Emblem 2019, 2020, 2021, 2022

$25.99

View Details
Thermal Shipping Label Holder for 4x6 Rolls and Fan-Fold Label Printer Accessory
Thermal Shipping Label Holder for 4x6 Rolls and Fan-Fold Label Printer Accessory

$7.99

View Details
DETROIT LIONS EMBROIDERED IRON ON PATCH 2.5” X 2.5” FREE SHIPPING
DETROIT LIONS EMBROIDERED IRON ON PATCH 2.5” X 2.5” FREE SHIPPING

$4.79

View Details
Pack of 120, 25 mm Plastic Round Bases Miniature Wargames Table gaming TEXTURED
Pack of 120, 25 mm Plastic Round Bases Miniature Wargames Table gaming TEXTURED

$8.99

View Details
US Durable No Buckle Elastic Belts Fits Belt Loops Buckle Free Waist Belts S/M/L
US Durable No Buckle Elastic Belts Fits Belt Loops Buckle Free Waist Belts S/M/L

$3.01

View Details